Demolition of Harborview Hospital
Date: August 2006 - October 2007
Owner: City of Valdez
Location: Valdez, Alaska
Prime Contractor: Coldfoot Environmental Services, Inc.
Synopsis: Abate all Class 1 Regulated Asbestos Containing Materials (RACM) and demolish two one-story concrete post and beam structures approximately 75,000 SF and includes a dirt crawl space.
|
 |
 |
Demolition of Public Warehouse #2
Synopsis: Abate all Class 1 Regulated Asbestos Containing Materials (RACM), all hazardous materials and demolish former fish processing plant. The building has a steel I-beam truss superstructure and light weight steel purlins for roof and wall support. Demolition is to include removal of entire structure to include footings and foundation. |
Demolition of Black Gold Recreation Center
Dates: April 2007 to October 2007
Owner: City of Valdez
Location: Valdez, Alaska
Synopsis: Abate all Class 1 Regulated Asbestos Containing Materials (RACM) and demolish a one-story wooden structure with metal roof. Demolition is to include removal of entire structure to include footings and foundation. |
 |
NO
PHOTO AVAILABLE |
Indefinite Deliveries Indefinite
Quantities Fencing Requirements
Dates: March 2007 - March 2008
Owner: US Air Force - Elmendorf Air Force Base
Location: Anchorage, Alaska
Synopsis: Maintain, repair, remove and install base wide fencing.
|
Housing Privatization - Phase 2
Date: June 2005 to September 2006
Owner: US Air Force – Elmendorf Air Force Base
Location: Anchorage, Alaska
Synopsis: Complete removal of all ACM Thermal Surface Insulation
(TSI) and Gypsum Wallboard from 564 family housing units
to include mechanical rooms and underground utilities
in preparation for demolition. |
 |
|

|
Project:
Indefinite-Delivery Indefinite-Quantity Asbestos Requirement
Date: October 2002 - September 2007
Owner: US Air Force – Elmendorf Air Force Base
Location: Anchorage, Alaska
Synopsis: Remove ACM from base-wide
commercial and industrial buildings. |
| |
|
University of Alaska Anchorage
Window Replacement
Date: July 2006 - September 2006
Owner: University of Alaska
Location: Anchorage, Alaska
Synopsis: Replace
all windows in six (6) buildings in the University
of Alaska, Anchorage’s Main Apartment Complex
(MAC). |

|


|
Abate Central Power Plant
Date: October 2005 - April 2006
Owner: US Air Force – Elmendorf Air Force Base
Location: Anchorage, Alaska
Synopsis: Remove Thermal Surface Insulation from a
four-leveled concrete and steel, 127,762 square foot
structure during winter months.
|
|
Abate 74 Steam Pits
Date: June 2004 - November 2005
Owner: US Air Force – Elmendorf Air Force Base
Location: Anchorage, Alaska
Synopsis: Removal of Thermal Surface Insulation from
74 steam pits and disposing of over 412 cubic yards
of ACM. |
NO
PHOTO AVAILABLE
|
|


|
Demolish Tank Farm 1
Date: April 2005 - October 2005
Owner: US Air Force – Elmendorf Air Force Base
Location: Anchorage, Alaska
Synopsis: Work included removal of Thermal Surface Insulation,
lead based paint abatement in a base pump house as well
as the demolition of a 600 square foot pump-house, 3-50,000
gallon tanks, backfilling with base material, demolishing
two abandoned pits, disconnecting utilities, demolishing
truck-fill-stand and paving at fill-stand, pump-house
and tank site.
|
|
Fort Wainwright Base Theater
Date: August 2004 - August 2004
Owner: Directorate of Contracting, Fort Wainwright
Location: Fairbanks, Alaska
Synopsis: Conducted site survey, environmental assessment,
sampling and analysis of all Class 1 and Class 2 Asbestos
Containing Materials (ACM) and removal of Thermal Surface
Insulation and CAB from a military base theatre in preparation
for demolition. |
NO
PHOTO AVAILABLE |
|
 |
Abate Dimond High School
Date: June 2004 - July 2004
Owner: Anchorage School District
Location: Anchorage, Alaska
Synopsis: Removal of Thermal Surface Insulation and
Cement Asbestos Board from a 41,302 square foot K-12
educational facility.
|
|
Demolish Various Buildings, Fort Wainwright
Date: April 2003 - October 2003
Owner: Directorate of Contracting, Fort Richardson
Location: Fairbanks, Alaska
Synopsis: Conducted site survey, environmental assessment,
sampling and analysis of all Class 1 and Class 2 Asbestos
Containing Materials (ACM) and provided consultation
and project management services for ACM abatement for
various buildings prior to demolition.
|
 |
|
|