Coldfoot Projects
|
Fort Wainwright Base Theater | |
|
Date: August 2004 - August 2004 Synopsis: Conducted site survey, environmental assessment, sampling and analysis of all Class 1 and Class 2 Asbestos Containing Materials (ACM) and removal of Thermal Surface Insulation and CAB from a military base theatre in preparation for demolition. | |
|
NO PHOTOS AVAILABLE | |




