|
Date: April 2005 - October 2005
Owner: US Air Force - Elmendorf Air Force Base
Location: Anchorage, Alaska
Synopsis: Work included removal of Thermal Surface Insulation, lead based paint abatement in a base pump house as well as the demolition of a 600 square foot pump-house, 3-50,000 gallon tanks, backfilling with base material, demolishing two abandoned pits, disconnecting utilities, demolishing truck-fill-stand and paving at fill-stand, pump-house and tank site.
|