|
Dates: April 2007 to October 2007
Owner: City of Valdez
Location: Valdez, Alaska
Synopsis: Abate all Class 1 Regulated Asbestos Containing Materials (RACM) and demolish a one-story wooden structure with metal roof. Demolition is to include removal of entire structure to include footings and foundation.
|