Coldfoot Projects
|
|
Abate all Class 1 Regulated Asbestos Containing Materials (RACM) and demolish two one-story concrete post and beam... |
|
|
Complete removal of all ACM Thermal Surface Insulation (TSI) and Gypsum Wallboard from 564 family housing units to include... |
|
|
Abate all Class 1 Regulated Asbestos Containing Materials (RACM), all hazardous materials and demolish former fish processing... |
|
|
Abate all Class 1 Regulated Asbestos Containing Materials (RACM) and demolish a one-story wooden structure with metal roof... |
|
Indefinite-Deliveries Indefinite-Quantities Fencing Requirements | |
| No Image Available |
Maintain, repair, remove and install base wide fencing. |
|
Indefinite-Delivery Indefinite-Quantity Asbestos Requirement | |
|
|
Remove ACM from base-wide commercial and industrial buildings. |
|
|
Replace all windows in six (6) buildings in the University of Alaska, Anchorage's Main Apartment Complex (MAC) |
|
|
Remove Thermal Surface Insulation from a four-leveled concrete and steel, 127,762 square foot structure during winter months. |
| No Image Available |
Removal of Thermal Surface Insulation from 74 steam pits and disposing of over 412 cubic yards of ACM. |
|
|
Removal of Thermal Surface Insulation, lead based paint abatement in a base pump house as well as the demolition of a 600 square foot pump-house... |
| No Image Available |
Conducted site survey, environmental assessment, sampling and analysis of all Class 1 and Class 2 Asbestos Containing Materials... |
|
|
Removal of Thermal Surface Insulation and Cement Asbestos Board from a 41,302 square foot K-12 educational facility. |
|
|
Conducted site survey, environmental assessment, sampling and analysis of all Class 1 and Class 2 Asbestos Containing Materials... |
| No Image Available |
This project consists of the demolition of building 4332 and the restoration of area to natural appearance. |
| No Image Available |
This project consists of the demolition of building 1437 and the restoration of area to natural appearance. |
| No Image Available |
This project is to demo the facility and the underground tanks with the facility. |
| No Image Available |
This project consisted of demolition of 4 residential properties in Mountain View as a part of the expansion and development of low income housing for Anchorage residents. |
| No Image Available |
This project consisted of the abatement and re-insulation of the mechanical utilidor at Tudor Elementary school. |
| No Image Available |
This project consisted of lead dust abatement of the MOA Bering Street Maintenance facility. |
| No Image Available |
This project consisted of the abatement and demolition of a 35 foot tall wood building measuring 65,000 square feet. Wood structure needed to be disassembled, salvaging support timbers that include 20 foot long posts and 180 foot trusses for reuse. Concrete slab was crushed to six inch minus material for use as backfill and all rebar was removed. |